85 lot subdivision.
This development work included all earthworks and roading (7545m2 of asphalt) and 2160m of kerbs and channel. All associated drainage, water mains and services trenching completed by Texco Excavating Ltd in house.
Some of the drainage was deep and involved trench shields with dewatering.