New Brighton Hot Pools

King Post Sea Wall

To provide sea wall protection for the proposed New Brighton Hot Salt Water Pools.

The broad pan sheet piles (5m in length) interlocked with the I Beam King Posts (10.5m in length). These were installed using the Hitachi CX500 crane fitted with an ICE 416L vibro.

Client

HEB Construction Ltd

Time Frame

May to June 2019

Contact Scale

Under $500,000

“Whilst we are guided by our Safety and Quality Management Systems, we still believe in the integrity of a handshake.”
0800 483 926   

[email protected]    

55 Lunns Road, Middleton, Christchurch 8543, New Zealand    
© 2020 Texco. All rights reserved. | Privacy Policy

Powered by Website Angels