To provide sea wall protection for the proposed New Brighton Hot Salt Water Pools.
The broad pan sheet piles (5m in length) interlocked with the I Beam King Posts (10.5m in length). These were installed using the Hitachi CX500 crane fitted with an ICE 416L vibro.