Texco completed three sheet pile pits to allow the installation of three sewerage pump stations.
This was part of the Picton sewerage upgrade. Texco completed the temporary works design, installation and excavation of the sheet pile boxes along with maintaining dewatering throughout the duration of the project.
The pits ranged in depths from 6 – 7.5m below ground level.